Skip to content
Anton Muckel Gerüstbau

Stair towers and site stairs

Safe access for your construction site in Jülich

Anton Muckel Gerüstbau plans, erects and rents stair towers, site stairs and escape stairs. Our yard is in Linnich, right next door in the Düren district.

  • Stair tower systems
  • Escape stairs
  • Modular scaffolding
Flight of stairs inside a steel scaffold against a blue sky
Stair flight in a steel scaffold
01

Why stairs

Access is not an accessory, it is where the work begins

Everything that has to go up on a site goes up the same way: people, tools, material, and in an emergency the way back down. A stair tower makes that route predictable.

  • 01

    Both hands free

    A ladder is something you climb. Stairs are something you walk. Anyone carrying tools or material reaches every level without ever changing grip.

  • 02

    The way back counts too

    Escape stairs are part of what we build. They are planned together with the structure and stand where they are needed in an emergency, not where space happened to be left.

  • 03

    Order in the schedule

    Fixed access sorts a site out. Trades use the same route, material travels the same track, and nobody spends the morning looking for the ladder.

02

Services

Stairs and towers built from modular scaffolding

A stair tower is built from the same system as the scaffold beside it. It can stand free or form part of the facade scaffold, and it follows the building rather than the other way round.

  • Stair tower systems

    Access for shell construction, refurbishment and industry. Free standing or tied to the scaffold, with a landing at every level.

  • Escape stairs

    The second way down. We plan it with the rest of the structure instead of adding it afterwards.

  • Modular scaffolding

    The system behind the tower. It adapts to setbacks and projections, to curved elements and to tight corners.

  • Heavy duty scaffolding

    When loads go beyond the everyday, different components carry them. Those are part of our range as well.

  • Temporary roofing

    The weather stays outside and the work carries on underneath. It combines with the scaffold and the access.

  • Equipment hire

    Hoists with and without passenger transport, telehandlers with attachments, and trucks with a loader crane and container body.

Not sure yet which answer fits? Describe the location and we will tell you what belongs there.

Describe your project
03

How it works

From the first call to the last component

Four steps, and you know where you stand at each of them.

  1. Enquiry

    You tell us the height, the access and the period. A phone call is enough, and so is the form on this page.

  2. Site survey

    We look at the location: the ground, the tie points on the building, traffic routes and the levels that have to be reached.

  3. Erection

    The tower is erected, tied in and handed over to you. You know afterwards what stands there and how it is used.

  4. On site and dismantling

    While the structure stands we stay reachable. At the end we dismantle it and clear the area.

04

Landing

Where a stair tower earns its place

Shell construction, refurbishment, industrial plant, event structures: as soon as more than one level is worked on, access decides both pace and safety.

  • Stair flights on the facade Access and scaffold as one unit on a residential building.
  • Access across many levels The higher the work goes, the more a fixed route upward matters.
  • The tower as its own structure Access can stand free beside a building and tie in at only a few points.
  • The way back down Wherever people work, the route out has to stay walkable at all times.
  • Access to existing buildings In conversion and refurbishment the stairs often run along the outside of the building.
05

Enquiry

Tell us about the location

Place, the height you need, the tie in and the period are enough to start. Everything else is settled at the survey.

06

Area

Jülich and the Düren district

Our yard stands in Linnich, Im Gansbruch 22. Jülich is the neighbouring town and both belong to the Düren district. The trip to the site is short, and that shows at every appointment.

Towns and municipalities

  • Jülich
  • Linnich
  • Aldenhoven
  • Titz
  • Niederzier
  • Inden
  • Langerwehe
  • Merzenich
  • Nörvenich
  • Düren

Districts of Jülich

  • Barmen
  • Bourheim
  • Broich
  • Kirchberg
  • Koslar
  • Lich-Steinstraß
  • Mersch
  • Merzenhausen
  • Pattern
  • Selgersdorf
  • Stetternich
  • Welldorf

Your town is not on the list? Ask anyway and we will tell you honestly whether we can serve the site.

Name your location
07

Questions

What gets settled before the first step